THE PROJECT The initial request of the customer involved the resolution of the problem of having a back-up heat generator to the existing turbogas, which would guarantee the production of hot water to [...].

The customer was in a position to renovate his thermal power plant. As part of its production, Voltan SpA encountered fluctuations in pressure of the outgoing steam which had an impact on the title of [...].

— n° 1 ASGX EN 6000
— n° 1 ECXV-KOND 40-50 (tipo A) 4000000 — 5000000 kcal/h — GX 4000
— n° 1 ASGX EN 10000
— n° 1 ECXV-KOND 8-12 (tipo A)

[...]

Once thing is to receive the request for a special declaration because of the boiler has to be lifted at 25 mts, to issue it, to send it and "close" the request and totally different is to r [...].

— n° 1 GSX 2500 12 bar
— n° 1 ECO-G 4 (A) — GSX 2500
— n° 1 Группа модуляции питательной воды с 2 насосами и шкаф

[...]

— n° 2 GX 15000 12 bar export
— n° 2 ECXV 150 (типа B) 15000000 kcal/h — GX 15000
— n° 2 Группа модуляции подачи питательной

[...]