Voltanway SpA

The customer was in a position to renovate his thermal power plant. As part of its production, Voltan SpA encountered fluctuations in pressure of the outgoing steam which had an impact on the title of the steam supplied, compromising the guarantee of delivery of dry steam and leading to cases of dragging of drops that […]

Teleriscaldamento Riva del Garda, Trento (IT)

THE PROJECT The initial request of the customer involved the resolution of the problem of having a back-up heat generator to the existing turbogas, which would guarantee the production of hot water to sustain the winter users during the maintenance periods of the turbine. The power plant was composed of an existing heat generator, with […]

Caseificio Sanguedolce

THE PROJECT The project stems from the company's need to invest in energy efficiency of its own thermal plant dedicated to the production of industrial excellence in the dairy sector. The previous steam generation plant consisted of an obsolete steam boiler without any type of heat recovery and a technologically backward combustion system. THE SOLUTION […]

Teaching Hub – Università di Bologna

«La dorsale impiantistica del Campus percorre in sotterranea l’asse del Trefolo – approfondisce l’arch. Marco Tarabella – distribuendo l’energia elettrica e termica provenienti dall’Energy House. Sulla copertura dei blocchi della didattica si concentrano gli impianti fotovoltaici e per il trattamento dell’aria. Qualità e comfort ambientale sono pensati, garantiti e gestiti dall’azione combinata di tre componenti: […]