Estover Piimatööstus OÜ – Produzione di Formaggio
The client's initial request was substitution of an old steam boiler with very low efficiency and disturbed steam production. Previously the plant was composed of a steam boiler with continuous surveillance of 6 t/h steam capacity which was working with a regular heavy oil burner After a careful analysis ICI Caldaie proposed a very […]
Tarmeko
The project consists of the installation of a thermal oil heat generator with over 2 MW of power. The production site is located in Estonia and uses diathermic oil for veneering and drying. The customer started by using wood chips for production and using gas fuel both for a cogenerator and for the diathermic oil […]