Rechercher

Olaines Cietums Prison Favility Heating Boiler Room

Case Study

The main scope of the project was to supply the best technical and commercial solution for a new boiler room with condensing boilers in order to increase the quality of life into the prison institution according with the EU demands. Accordingly, the project was designed from the ground by our local distributor in Latvia, based on the specifications of the GREENOX.e 100, GREENOX.e 170 boilers together with suitable condensers BAX-C 88 and BAX-C 128. The requirement followed by ICI CALDAIE was the supply of high efficient boilers with condensing option having the main goal life improvements, the lowest ration between cost of investment and operation costs into a new and limited space boiler room. The result is a stat of the art installation with low emissions and high efficiency.

Chaudières installées

Générateur de chaleur à faible charge thermique avec foyer à flamme traversante à trois parcours de fumée et...

Puissance utile: 420 ÷ 3000 kW

Pression de conception: 5 bar

Efficacité: > 95,0 %

Voulez-vous en savoir plus?

Si vous avez besoin de plus d’informations, d’échantillons, d’un devis ou de conseils pour un projet, veuillez remplir le formulaire ci-dessous et nous serons heureux de vous aider.