Hospital Clínico Herminda Martín

Case Study

THE PROJECT

The project involved the modernization of the old existing coal-fired power plant with a new thermal power plant operating with a main fuel (methane gas) and a reserve fuel (diesel).

THE SOLUTION
2 steam boilers were supplied for a total production of 5 tons / h and 3 heat generators for a total power of 4 MW serving the heating and domestic hot water production systems.
The intervention included the design of the new power plant, the civil works, the assembly of the equipment and the modernization of the distribution networks.

Chaudières installées

La gamme SIXEN N comprend des chaudières à vapeur monobloc à tubes de fumée, avec retour d’eau et...

Production de vapeur: 350 à 5000 kg / h

Puissance utile: 238 ÷ 3407 kW

Pression de conception: 12 ou 15 bar

Efficacité: > 90,0%

REX

Générateur de chaleur à inversion de flamme avec foyer de forme cylindrique complètement fermé dans la partie arrière...

Puissance utile: 90 ÷ 3500 kW

Pression de conception: 5 bar

Efficacité: de 92,0 % à > 95,0 %