Aboca SPA

Case Study

Detalle

THE PROJECT
The initial request of the customer involved the resolution of the problem of having a steam boiler destined for the research and development area, delocalised with respect to the primary steam distribution. The thermal power plant was built from scratch with a sandwich panel structure and positioned inside a GSX series steam boiler of 3 t / h producibility, equipped with a system for continuous operation without supervision up to 72 hours, economiser and other accessories to maximize performance

THE SOLUTION
After a careful comparison with the designer, a GSX 3000 series boiler was supplied which fully met the expectations and achieved the objectives sought in the delicate design phase: efficiency up to 95%, NOx atmospheric emissions below 100 mg / kWh and economy in management without the help of the ever present licensed driver.

Calderas instaladas

GX

La gama GX presenta generadores de vapor monobloque con prestaciones excelentes, diseñados para ofrecer la máxima garantía de...

Producción de vapor: 1700 ÷ 32000 kg/h

Poder útil: 1163 ÷ 17442 kW

Presión de diseño: 12 o 15 bar

Eficiencia: 90,0 %

¿Le gustaría saber más?

Si necesita más información, muestras, una cotización o asesoramiento para un proyecto, complete el siguiente formulario y estaremos encantados de ayudarle.