Antibiotice General Contractor Superheated Steam boiler room

Case Study

The task from our customer was to substitute an old superheated steam with a new and efficient solution, of higher capacity in order to answer to the new plant requirements. Due to the limited time schedule of the project it was needed a turn key project. In this regard, ICI CALDAIE together with one of its local partners, managed and successfully completed this turn key project in which we had to remove the existing boiler, to design, install and supply all necessary materials for this new installation of a higher capacity superheated steam boiler. We supplied a GX S boiler with a capacity of 10 t/h of superheated steam, 5.5 bar superheated steam pressure and 94% efficiency. We supplied the boiler along with GSS 72 system which allows operation without surveillance for 72h, economizer and modulating feed water system. The project was completed by putting into operation performed by ICI CALDAIE and as a result the boiler room was successfully authorized in conformity with local regulations. The maximum capacity was examined and confirmed by the customer through a continuous 72h test, continuous operation and a low NOx value less than 100 mg/kWh was recored.

Calderas instaladas

GX

La gama GX presenta generadores de vapor monobloque con prestaciones excelentes, diseñados para ofrecer la máxima garantía de...

Producción de vapor: 1700 ÷ 32000 kg/h

Poder útil: 1163 ÷ 17442 kW

Presión de diseño: 12 o 15 bar

Eficiencia: 90,0 %

¿Le gustaría saber más?

Si necesita más información, muestras, una cotización o asesoramiento para un proyecto, complete el siguiente formulario y estaremos encantados de ayudarle.