Home | Case Study | Manufacturing industry
– n° 2 GREENOx.e 70 [...].
– n° 1 WHB – Heat recovery generator for steam production [...].
– n° 1 WHB – Heat recovery generator for steam production [...].
A prefabricated boiler room using with 5 ICI CALDAIE ASX 2500 hot water boilers was recently commissioned at the Grange Gorman Interim Energy Centre in Dublin. Thanks to a clever design by Alternative [...].
– n° 1 GSX 2500 15 bar export– n° 1 ECO-G 4 (A) – GSX 2500 [...].
– n° 2 GX 1750 15 bar– n° 2 ECXV 15-20 (type B) 1500000-2000000 kcal/h – Sixen 3000-GX 1750– n° 2 ECXV-KOND 15-20 (tipo A) 1500000 – 2000000 kcal/h – Sixen 2500 [...].
– n° 1 SIXEN 2000 12 bar export [...].
– n° 1 GSX 650 12 bar export [...].
– n° 1 GX 15000 15 bar export– n° 1 Gas modulating pressure jet burner– n° 1 GSS 24/0 global security system 24H– n° 1 Modulating feed water system via electrically actuate [...].
– n° 1 ASX 800 5 bar [...].
– n° 1 ASGX EN 6000– n° 1 ECXV-KOND 40-50 (tipo A) 4000000 – 5000000 kcal/h – GX 4000– n° 1 ASGX EN 10000– n° 1 ECXV-KOND 8-12 (tipo A) 800000 – 1200000 k [...].