Home | Case Study | Food&Beverage
– n° 2 GSX 3000 P 12 bar export
– n° 2 ECO-G 4 (B) – GSX 3000
– n° 2 GSS 72/2X – with PLC SIEMENS mod.S7-1200 and HMI SIEMENS 7” mod.TP700
̵
[...]
– n° 1 ASGX EN 6000
– n° 1 ECXV-KOND 40-50 (tipo A) 4000000 – 5000000 kcal/h – GX 5000
– n° 1 GSS 72 Global Safety System For Superheated Water Boilers [...]
– n° 1 GSX 1100 12 bar
– n° 1 Comprehensive security system GSS 72/2X
[...]
– n° 2 ASX 1750 – 12 bar
[...]
– n° 1 SIXEN 2000 12 bar export
[...]
– n° 1 WHB – Heat recovery generator for steam production
[...]
– n° 2 SIXEN 2000 12 bar export
[...]
– n° 1 GSX 3500 15 bar
– n° 1 Backup supply pump for steam boilers GX 3000 / GSX 5000 / GSX P 6000
– n° 1 ECO-G 5 (B) – GSX 3500
– n° 1 Modulating
[...]
– n° 1 WHB – Heat recovery generator for steam production
– n° 3 ECO1 for WHB
– n° 1 Backup supply pump for boilers 3000÷3500 kg/h steam
– n° 1 Mod
[...]
– n° 1 SIXEN 1350 12 bar export
– n° 1 Gas high/low pressure jet burner
[...]
THE PROJECT The initial request of the customer involved the resolution of the problem of having a back-up steam boiler to the existing one that had a producibility adequate to the needs and a high ef [...].
The client's initial request was substitution of an old steam boiler with very low efficiency and disturbed steam production. Previously the plant was composed of a steam boiler with continuous su [...].