Scuderia Ferrari 4WD Building

– n° 2 GREENOx.e 200– n° 2 Gas high/low progressive pressure jet burner low nox– n° 2 Boiler control panel with eterm ® electronic board

Davos

– n° 1 GSX 2500 12 bar

Hesperia Hospital

– n° 1 BX 400 exp– n° 1 GSS 24/0 global security system 24H– n° 1 GREENOx.e 90– n° 1 REX 95 F

Caseificio Sanguedolce

THE PROJECT The project stems from the company's need to invest in energy efficiency of its own thermal plant dedicated to the production of industrial excellence in the dairy sector. The previous steam generation plant consisted of an obsolete steam boiler without any type of heat recovery and a technologically backward combustion system. THE SOLUTION […]

Teaching Hub – Università di Bologna

«La dorsale impiantistica del Campus percorre in sotterranea l’asse del Trefolo – approfondisce l’arch. Marco Tarabella – distribuendo l’energia elettrica e termica provenienti dall’Energy House. Sulla copertura dei blocchi della didattica si concentrano gli impianti fotovoltaici e per il trattamento dell’aria. Qualità e comfort ambientale sono pensati, garantiti e gestiti dall’azione combinata di tre componenti: […]

Ospedale dei Castelli Romani

– n° 2 GX 1750 15 bar export– n° 2 ECXV 15-20 (type B) 1500000-2000000 kcal/h – Sixen 3000-GX 1750– n° 2 Modulating feed water system via electrically actuated valve DN 25 for Sixen 3000-3500 / GX 1750-2000 / GSX 3000-3500– n° 3 GREENOx BT COND 230

Poste Italiane – Sede centrale di Roma

THE PROJECT The project consists in the total redevelopment of the thermal power plant at the service of the central post office in Rome.   THE CHALLENGE At the time of the redevelopment, some old competitive boilers were installed in the plant, installed over thirty years before, characterized by very low yields and high operating […]

Maserati S.p.A.

– n° 2 Codex 1200– n° 2 Gas modulating pressure jet burner– n° 2 Boiler control panel with eterm ® electronic board

Rete Teleriscaldamento Ospedale Carlo Poma (I°)

– n° 3 ASGX EN 11000– n° 2 Pressure jet dual block natural gas burner– n° 1 Gas-light oil modulating pressure jet burner– n° 3 TSS 72 KIT hot water 72H safety thermostat.>150 °C

TIBA – Limonta Sport

LIMONTA 1893 Innovazione e risparmio energetico ai massimi livelli Intervento di realizzazione nuovo impianto produttivo per la produzione di erba sintetica per campi da calcio. Il progetto T.I.B.A. Srl nasce dall’esigenza dell’azienda cliente di investire nell’efficientamento energetico del proprio impianto termico dedicato alla produzione. Il precedente impianto di generazione del vapore per processi industriali consisteva […]

Carlsberg Italia

The initial project involved the construction of the new thermal power plant for the Italian headquarters of the multinational Carlsberg. After careful analysis, ICI Caldaie proposed the supply of a GX 10000 steam boiler complete with ladder , the ECXV 90-100 economizer, useful for the recovery of 606 kW of power and the global safety […]