The initial request of the customer involved the resolution of the problem of having a back-up heat generator to the existing turbogas, which would guarantee the production of hot water to sustain the winter users during the maintenance periods of the turbine.
The power plant was composed of an existing heat generator, with three effective turns of smoke with management and control systems to which the ns. generator doubling the power of the system.
THE SOLUTION
The supply was then calibrated on a TNOX 14000 model generator with increased operating pressure to cope with the large-scale district heating distribution, the regulation and safety systems were implemented with digital controls and burner with low emissions of pollutants. Together with the thermal unit, a self-supporting chimney was supplied, complete with a silencer to reduce noise emissions to a minimum since the installation was in a densely populated urban center.
If you need further information, samples, a quote or advice for a project, please fill out the form below and we would be happy to help.
This website uses cookies in order to improve its services and the browsing experience of its readers.
If you decide to go on with your browsing, it means that you are accepting their use.OkNoPrivacy policy