Mercedes-Benz Plant

Case Study

- n° 5 REX 200
- n° 5 Boiler control panel with eterm ® electronic board

Boilers installed

REX

Reverse flame boiler with cylindrical furnace completely closed on the rear side by a dished end supported by...

Nominal power: 90 ÷ 3500 kW

Design pressure: 5 bar

Efficiency: from 92.0% to > 95.0%

Would you like to know more?

If you need further information, samples, a quote or advice for a project, please fill out the form below and we would be happy to help.