Ospedale S.Maria Della Speranza, Battipaglia

Case Study

- n° 2 GREENOx.e 230
- n° 1 Boiler control panel with eterm ® electronic board
- n° 1 Boiler control panel with eterm ® electronic board and etermWEBready
- n° 2 NEOX 325 M.MD.LR.IT.A.1.50.FA

Boilers installed

Three pass, wet back, low thermal load boiler, with single pass flame furnace, connected to forced draft burners...

Nominal power: 420 ÷ 3000 kW

Design pressure: 5 bar

Efficiency: > 95,0 %

Methane gas burner of the modulating type suitable to satisfy the output required by the boiler to which...