Home | Case Study | Health and reception facilities | Ospedale M.O. A.Locatelli, Piario (BG)
- n° 1 GREENOx.e 120
- n° 1 NEOX 155 M.MD.LR.IT.A.1.50.FA
- n° 1 Avviamento Italia NEOX 100 - 400
- n° 1 Boiler control panel with eterm ® electronic board
- n° 1 Interfaccia ModBus eterm con modem 4G GSM/GPRS
Three pass, wet back, low thermal load boiler, with single pass flame furnace, connected to forced draft burners...
Nominal power: 420 ÷ 3000 kW
Design pressure: 5 bar
Efficiency: > 95,0 %
Methane gas burner of the modulating type suitable to satisfy the output required by the boiler to which...
If you need further information, samples, a quote or advice for a project, please fill out the form below and we would be happy to help.