Istituto San Giovanni di Dio Fatebenefratelli

Case Study

Detail

- n° 3 GREENOX BT COND 160
- n° 3 NEOX 230 M.MD.LR.IT.A.1.50.FA
- n° 1 Boiler control panel with eterm ® electronic board and etermWEBready
- n° 2 Boiler control panel with eterm ® electronic board
- n° 6 Neutralizer

Boilers installed

Three pass wet back condensing boiler able to produce hot water with a maximum temperature of 100°C., BAX...

Nominal power: 1000 ÷ 3000 kW

Design pressure: 5 bar

Efficiency: > 107,0 %

Methane gas burner of the modulating type suitable to satisfy the output required by the boiler to which...