Hotel Marriot Riyadh Diplomatic Quarter

Case Study

- n° 2 REX 95 F
- n° 2 Boiler control panel with eterm ® electronic board
- n° 2 Gas high/low progressive pressure jet burner
- n° 6 BTS 5000 teflon-lined boiler with removable exchanger LT 5000

Boilers installed

REX

Reverse flame boiler with cylindrical furnace completely closed on the rear side by a dished end supported by...

Nominal power: 90 ÷ 3500 kW

Design pressure: 5 bar

Efficiency: from 92.0% to > 95.0%

Would you like to know more?

If you need further information, samples, a quote or advice for a project, please fill out the form below and we would be happy to help.