Carlsberg Italia

Case Study

Sector

Country

Detail

The initial project involved the construction of the new thermal power plant for the Italian headquarters of the multinational Carlsberg.
After careful analysis, ICI Caldaie proposed the supply of a GX 10000 steam boiler complete with ladder , the ECXV 90-100 economizer, useful for the recovery of 606 kW of power and the global safety system 72 hours GSS 72 for the management waiver and finally a Weishaupt brand burner.

 

Boilers installed

GX

The GX range features outstanding monobloc steam generators, designed to give maximum reliability and durability. All models have...

Steam production: 1700 ÷ 32000 kg/h

Nominal power: 1163 ÷ 17442 kW

Design pressure: 12 or 15 bar

Efficiency: 90,0 %