Emer Z.O.O. SP.K. – Rzonca

Case Study

The thermal plant is designed for the installation of two steam generators for a total steam production of 14 t / h at a pressure of 12 bar.
Currently the production of 7 t / h is provided by ICI Caldaie's GX three-pass smoke generator.
The supply is completed by ECXV series economizers for pre-heating of the supply water, the kit for modulating power supply and the GSS 72 safety system which guarantees total safety of operation without a supervisor for 72 continuous hours.

Boilers installed