Centrale Termica Villaggio Atleti

Case Study

THE PROJECT
Having worked in partnership on other prestigious projects in the past, in particular MediaCityUK in Salford, the company developed to create sustainable energy plants, Vital Energi, has chosen ICI Caldaie as a partner in this ambitious project, entrusting it with the costs of manufacturing, supply , delivery and installation of three high efficiency boilers by 3MW power, which is part of the new integrated thermal power plant to measure.
 
"When we were assigned the work for the Commonwealth Games Athletic Village (CGAV) - probably one of the most prestigious and high-profile projects that Vital Energi maybe tackled - we had to decide on our supply chain and sub-contractors with a lot of attention "- said Andrew Whitelock, Senior Quantity Surveyor of Vital Energi.
 
"From past experiences we were confident that ICI Caldaie provided us with the quality of service, delivery times and the costs necessary to satisfy our customer over a very limited period of time. He did not disappoint."
Now that it has successfully completed the customized thermal power plant with combined heat and power (CHP) technology, it will deliver all the heating and hot water for development through a network of 28 km of pre-insulated underground pipes that connect the 704 'eco' houses friendly of the athletes Village, the Emirates Arena, the Sir Chris Hoy Velodrome and a nursing home for the availability of 120 beds.
 
Not all competitors at the 2014 Commonwealth Games can win gold, watch and bronze at next year's event in Glasgow, but they will all be winners in the race to respect the environment with the help of the leading boiler manufacturer in the sector. ICI Boilers.
 
ICI Caldaie was chosen to work with the main contractor Vital Energi to build a £ 10,000,000 carbon-reduction heating system for the Athlete's Village in Glasgow. Scotland's largest city is committed to organizing the event and will aim to host the 'Greenest Games Ever,' as part of a wider environmental sustainability initiative.

Boilers installed

TNX

The TNX range includes boilers with three flue gas passes, wet back and automatic operation, suitable for the...

Nominal power: 3000 ÷ 20000 kW

Design pressure: 6 bar

Efficiency: > 92,0 %